Reactive Furnishing, Flooring & Appliances
- Location: London
- Flats: 52
- Client: Morgan Sindall
Morgan Sindall commissioned us to undertake the full furnishing, appliance supply, and carpet installation for a 52-unit residential development in the heart of Westminster. The development required a turnkey FF&E solution that aligned with both high design standards and tight build schedules. Our team delivered a cohesive package that enhanced comfort, liveability, and move-in readiness across all units.
- Location: London
- Flats: 52
- Client: Morgan Sindall
Client:
The Challenge
Morgan Sindall required a turnkey FF&E solution for a 52-flat residential scheme in Westminster, London. The brief involved furnishing the flats completely — including carpets and appliances — to a high standard suitable for immediate occupancy. The challenge was to deliver this within a strict timeline and in coordination with ongoing construction, ensuring minimal disruption and zero delays to phased handovers. Key challenges included: Coordinating multiple trades in a live site environment Achieving high-spec finishes within short timeframes Ensuring consistency across 52 units of varying layouts Managing deliveries and installation in a tight central London location
Client:
The Solution
We provided a fully managed, end-to-end solution that included: Furniture Supply & Installation: Beds, wardrobes, dining sets, sofas, and storage tailored to unit sizes and layouts. Appliance Package: Installation of integrated ovens, hobs, fridge/freezers, washer/dryers, and small kitchen appliances. Carpet Supply & Fitting: Durable, low-pile carpets with underlay fitted across living and bedroom areas to match the interior palette. Logistics Coordination: Staggered deliveries aligned with build phases, with dedicated on-site supervisors ensuring smooth execution. Quality Assurance: Each unit was inspected and signed off internally before handover, ensuring snag-free completion.
Client: The Impact
Programme Success: All 52 flats were completed on time, ready for immediate occupation.
Zero Snags: Pre-handover inspections and quality controls led to a defect-free delivery.
High Client Satisfaction: Morgan Sindall praised the team’s flexibility, reliability, and professionalism.
Sustainability: Over 95% of packaging was recycled. All appliances met high energy efficiency standards (A+ or above), and all carpets adhered to low-VOC standards.
“Exceptional delivery on a complex scope. The finish quality on the furnishings and carpets was excellent, and the install teams worked efficiently within our programme constraints.”
— Senior Site Manager, Morgan Sindall